Obsolete instruments still run many plants, and the way you manage their spare parts decides how long they remain viable. This guide covers risk assessment, critical spares lists, reverse engineering, and planning a controlled migration to supported models.

The Reality of a Legacy Instrument Base
Most plants run on a mix of instruments, some installed only a few years ago and others commissioned before many current staff joined. Legacy devices continue to perform useful duty, and replacing them wholesale is often neither practical nor affordable. The challenge is to keep them reliable while recognising that support will eventually disappear.
A spare-parts strategy is the practical answer. It accepts that obsolescence is inevitable and manages the consequences rather than waiting for a failure to force the issue. The strategy covers what to stock, how to source it, and when to migrate to a supported model.
Assess the Risk of Each Legacy Device
Start by listing legacy instruments and scoring the risk each represents. Consider how critical the measurement is, how often it fails, whether spares exist and how hard it would be to source a replacement. A non-critical indicator on a tank may tolerate improvisation, while a safety-critical level switch on a pressure vessel does not.
Documentation is often thin for old equipment, so rebuild the picture where you can. Serial numbers, nameplates and maintenance history, even if incomplete, help you judge remaining life. A Rosemount level switch with a known service record is easier to plan around than an unmarked device with no history.
- Rate each device by process criticality and safety consequence.
- Estimate failure frequency from maintenance records.
- Check whether the manufacturer still supports the model.
- Identify single points of failure with no installed spare.
- Note any device that has no viable equivalent in current production.
Build a Critical Spares List
A critical spares list is a deliberate inventory rather than an accidental pile of old parts. For each essential device, decide whether to hold a complete unit, a repair kit or a set of the failure-prone components. Holding a complete unit is expensive but fast; holding components is cheaper but slower and requires skilled repair.
- Complete spare unit for the most critical duties.
- Repair kits for devices with known failure modes.
- Consumables such as seals, gaskets and O-rings.
- Documented repair procedures for the maintenance team.
Balance the cost of stock against the cost of downtime. For a device whose failure stops production, the economics usually justify a complete spare. For less critical duties, a small kit or a documented repair procedure may be enough. Review the list annually, because criticality changes as the plant evolves.
Source Parts Without Compromising Quality
Sourcing spares for obsolete devices requires care. Genuine new-old-stock is ideal but scarce, refurbished units can fill gaps if they are properly tested, and third-party equivalents may be acceptable for non-critical duties. Whatever the source, verify condition, calibration and documentation before the part goes into the store.
Be cautious about counterfeit and grey-market parts, which are common on discontinued lines. Test incoming spares rather than trusting a label, and record where each item came from. For discontinued control hardware such as the ABB V18345, confirm that the unit matches the configuration the loop expects before installation.
Repair, Reverse Engineer or Replace
When a part cannot be sourced, three options remain: repair the existing unit, have an equivalent reverse engineered, or replace the device with a supported model. Repair is the cheapest if the fault is simple and the materials are available. Reverse engineering is viable for simple mechanical or electronic parts but carries quality and liability risk.
Replacement is the most robust answer but the most disruptive. It may require new piping, wiring, calibration and documentation. Where a device can be replaced without process change, such as a positioner of similar form, the migration is straightforward. Where the loop is embedded in an old control system, plan the change carefully.
Plan a Controlled Migration
The best moment to migrate is before a failure forces your hand. Build a migration plan with dates, budget and process impact, prioritising the devices with the highest risk and the least support. Bundle migrations with scheduled shutdowns to reduce disruption and cost.
Treat migration as an opportunity, not just a repair. A modern replacement may add diagnostics, digital communication and better accuracy, and may reduce the spares burden. Choose models that fit your standardisation programme so the long-term inventory stays manageable. Industry coverage at Automation.com often tracks end-of-life announcements that help you anticipate the next wave of obsolescence.
Obsolescence is not a question of whether support will end, but of whether you have planned for the day it does.
Maintain the Strategy Over Time
A spare-parts strategy is a living document. Update the useful-life estimates, review the spares list, and record every replacement so the next decision is informed. Feed insights from the maintenance team, who see the failures first, into the plan.
Keep the discussion open with suppliers about remaining support and alternative parts. Communities such as the Control.com forums and the engineering discussions at Eng-Tips can help identify cross-compatible parts, though anything safety-related must still be verified formally. When a legacy device finally becomes uneconomic, browse /products to find a supported replacement and confirm availability through /contact.